I have tried creating a new (7-point-scale) variable from two different ones.
The command I have used is
Generate globalass_6m = 1 if x2_overallhow==1 | x3_overallhow==1
However, I need to be able to do this from 1 to 7.
Can anyone help?
Thank you.
- M Floor
The command I have used is
Generate globalass_6m = 1 if x2_overallhow==1 | x3_overallhow==1
However, I need to be able to do this from 1 to 7.
Can anyone help?
Thank you.
- M Floor
Comment